PROJECTFACTS
Project cost
(NOK
value in 1998): NOK 976 million
Construction period: 1995-2001
Tunnel length: 24.5km
Access adit/ventilation tunnel: 2.1km
Turning points: 16
Emergency lay-bys: 48
Maximum hourly traffic: 400 vehicles
Average annual daily traffic: 1,000 vehicles
NEW
WORLD RECORD
LAERDALSTUNNELEN (Norge/Norway) 24500m
St.
Gotthard (Sveits / Switzerland) 16918m
Arlberg (Austerrike / Austria) 13972m
Frejus (Frankrike-Italia / France-Italy) 12901m
Mont
Blanc (Frankrike - Italia / France - Italy) 11600m
Gudvanga (Norge / Norway) 11400m
Kan Etsu
(Japan) 11090m |